Elje / Trade

For architects

Specify China-made fit-out with the compliance evidence attached and a landed price per line, so the design is not swapped out at tender.

What you can rely on

  • Compliance before catalogue: no tapware or sanitary item without a current WaterMark certificate checked on the ABCB register, and WELS where it applies.
  • Wet-area tiles with an AS 4586 slip report. Glass to AS 1288. Cabinetry board with an E0 or E1 test report. RCM for anything electrical.
  • No engineered stone. Porcelain, sintered and natural stone only, with the test report.
  • Each order inspected against your drawings at the factory before the balance is released.

How it sits in your process

StageWhat Elje gives you
Concept and design developmentIndicative landed prices per line to test the budget
DocumentationEL codes and spec text per item, and from 2028 BIM objects
TenderLanded prices the builder can carry, with the factories named at introduction
ConstructionShop drawing review, samples and the inspection report

What we will not do

Elje is paid by both sides: factories pay Elje a fee, printed on every quote. Ranking comes from the scorecard alone, never from payment.

Questions

Can I see the certificate before I specify?

Yes. Every item's certificate number is listed, and you can check it on the issuing register yourself.

Who pays Elje?

Your client pays the $990 Project Plan (free on your first job) and Elje Assured, 2% of the order with a $600 minimum. The factory pays a 5% introduction fee. Every fee is printed on every quote. Your trade account is free.